The enormous logo (by house designer Henri Ritzen) is fitted out with energy-saving LED lights, which can be adjusted manually. The outer walls of Orion are nearly finished. The rest of the building should be ready in the summer. There is a practical reason why the logo has gone up already: the scaffolding is still up now.
Orion and the new skyline
The lights were first shone on Orion just before Christmas. A test. But a repeat was allowed this week especially for this photo of the new campus skyline.