Organisation
Buildings

High-up

You can hardly make out the tiny figure at the top of the crane, at least sixty metres up. 'Must be some high-up or other,' joked Bert Rijk, who took the photo and sent it to Resource.

The man probably climbed up to attach the cable with which the cabin was detached a little later. The outside of Orion is finished so the crane can be moved on to the next job. There is still some work to be done inside the building before the opening in May. But there won’t be so many thrills for this high-flier.

Leave a Reply


You must be logged in to write a comment.